we provide advice of submersible pump installation,submersible pump working,submersible pump troubleshooting,submersible pump stopped and other pump technology articles.
1. In accordance with the provisions of the design, construction, installation and acceptance regulations, specifications and other technical documents and combined pumping station for the specific circumstances, the pumping stations civil engineering and mechanical and electrical equipment installation for quality inspection and identification for the comprehensive, systematic, as a basis for the assessment of engineering quality.
2. Through the pump test run can be found as early as possible omissions and incomplete work, find the defects existed in engineering and mechanical and electrical equipment for early treatment, avoid the occurrence of accidents, buildings and mechanical and electrical equipment safety -- to ensure reliable operation.
3. Through the pump test test operation of main and auxiliary coordination of joint operation of machinery, master electromechanical equipment, technical performance and necessary technical parameters, main equipment characteristic curves were obtained, for pumping station officially put into operation technical preparation.
4. In the large and medium-sized pumping stations or conditional pumping station can also be combined with trial run of field test, so as to carry out the economic analysis on the operation, meet the requirements of unit operation, low energy consumption and high efficiency.
Through the test run of the pump can be used to test the quality of pumping station construction and installation works, for the acceptance of the pump station and the official put into operation as the necessary technical preparation.