Shenlong Pump News Center

pump industrys new and pump technology articles

we provide advice of submersible pump installation,submersible pump working,submersible pump troubleshooting,submersible pump stopped and other pump technology articles.

Technology

Home > News > Technology

Attention should be paid to the installation of self priming pump

Self-priming pump
1.Pump from the power supply is the power of the motor transmission line should be bold, the pump working voltage range does not exceed the rated voltage of 5% to 12%, otherwise it will make the motor life shortening or burn motor. 
 
2.Water pump should be installed leakage circuit breaker or electric shock protector, and to carry out a reliable grounding, to ensure safety. Measuring the insulation resistance of the motor should be more than 2MQ. 
 
3.When installing on the power switch, the pump air speed minutes, starting, running and check whether it is normal to. 
 
4.After the installation of the pump should be checked whether there is no loosening of the bolt, the tightening torque of the fastening screws is uniform. 
 
5.The water inlet pipe of the pump shall not use a rubber tube, may not be too soft, so as not to suck flat. 
6.Water pump inlet valve must be placed perpendicular to the horizontal plane, from the bottom of 30cm or more, so as not to suck on sediment.

Chat Online & Leave Message

Please send email to : enquiry@apkpump.com
Or leave message in following form.
@
Please briefly tell us your needs (pump type, working envirment)