we provide advice of submersible pump installation,submersible pump working,submersible pump troubleshooting,submersible pump stopped and other pump technology articles.
The net distance between the two pumps should not be less than 700mm, the front end of the pump operating channel width should not be less than 1000mm, for the multi-stage pump, the front end of the pump overhaul channel width should not be less than 1800mm. General pump front end overhaul channel width should not be less than 1250mm, in order to pass through the small forklift.