Analysis the requirement of installation of magnetic drive pump

According to the requirements of the pipeline installation, in the configuration of the pump pipe, install the following matters need to pay attention to.

1. Must be on all the suction, discharge pipe for a separate support or hanging pull, and with the pump flange into a line of natural. Pump suction pipe and discharge pipe have their support and hanger, does not allow the pipeline of the medium weight borne by the pump group, in order to avoid the crush of pump.

2. The structure of the pump suction pipe and pipe connection parts shall be designed according to the requirements of the design requirements. Ensure that the pressure and torque transmitted to the pump body are not exceeding the allowable value. At the same time to ensure that the pump inlet medium flow rate to be smooth, to avoid pipe connections (such as elbows, valves, etc.) caused by changes in the flow rate. The change of inlet velocity has great influence on the pump head, the cavitation margin and the smooth running of the pump.

3. Self priming magnetic pumps pump suction export pipeline installation height, length and diameter shall meet NPSH calculation value, and to ensure that the pump at work, not to exceed the allowed NPSH.

4. The suction pipe is higher than the installation position of the pump, the suction pipes in the rush to ensure flow rate of not more than 2m / S; discharge pipes below the pump installation, discharge calculation of pipeline to ensure that the flow rate of not more than 2.5 m / S; close to the boiling point of liquid delivery, velocity should not be more than 0.8m / S.

5. Only in the mortar curing, pump and motor of anchor bolts tightened, can be connected to the pump pipe end up.

6. The pipeline should be installed with the expansion ring, so that the linear expansion of the pipeline is not caused by the deviation.

7. Flush and drain the pump should be installed to enable the pump to be washed and discharged before removal.

8. Before installing the pump, the pipeline should be thoroughly cleaned to prevent the solid from entering the pump, causing the pump equipment to be damaged.

9. Gaskets and gasket materials must be applied to process requirements.

Maybe you are interested in following articles

Chat Online & Leave Message

Please send email to : info@apkpump.com
Or leave message in following form.
@
Please briefly tell us your needs (pump type, working envirment)