Installation and use of sewage pump without clogging pipeline:
1. First check whether the external fasteners in the transport of loose.
2. Check if the power supply voltage in accordance with requirements of the motor nameplate.
3. The power supply is switched on turning a, see impeller pump refers to indicate the direction, such as reverse direction, cable in any second phase swap can be test time can not be too long, so as not to damage the seal.
4. The pump will be installed, boot operation. The best can be mounted on the foot screw pump.